Copper plant equipment production management

The equipment assets of the entire plant are managed by the Equipment Section.

Fixed assets of equipment: The service life of a single equipment is more than one year. The purchase price (ex-factory price, transportation and miscellaneous fee, installation fee, management fee, etc.) is listed in the fixed assets of the equipment.

Equipment selection, installation, handover use, file storage and storage, internal adjustment of the plant, application for renewal and reconstruction of the mine, scrapping, and determining the repair plan are handled by the equipment department.

The operation and operation of the production equipment shall be carried out by using the fixed person, the fixed machine and the operation permit.

The installation location and conditions of use of the equipment shall not be adjusted or changed without the consent of the equipment office and the long mine.

The structural attachments, motors, etc. of the equipment shall not be altered without the consent of the equipment department and the mine manager.

Assessment method

If the equipment is damaged by unlicensed or unauthorised use of the equipment for 30 to 50 yuan, the repair cost shall be borne by the responsible person.

Anyone who arbitrarily changes the location of the installation site of the equipment shall, in addition to ordering the equipment to be returned to the original place, with a deduction of 30 to 50 yuan, resulting in equipment damage, the repair cost shall be borne by the responsible person.

Unauthorized changes to the original structure of the equipment, the motor of the accessory device, etc., at the place of 30 to 50 yuan deduction, the cost of restoring the equipment is borne by the responsible person.

If the equipment is not used as required, the conditions of use of the equipment shall be changed without authorization. Unless it is used as required, and the original conditions of use are restored, the deduction shall be made at 30 to 50 yuan, resulting in damage to the equipment, and the repairing fee shall be borne by the responsible person.

The equipment has been fixed, and the user of the equipment with the operation permit, if it does not care for the equipment, illegal operation, or equipment, causing damage to the equipment during the operation and use, the person responsible for the repair shall bear the responsibility.

Equipment inspection system and assessment methods

The equipment department will take the lead and organize a factory-wide equipment inspection every month. For the problems found, the equipment department will issue a written notice of rectification of hidden dangers to the construction section in a timely manner, and limit the time limit for rectification. The construction section must complete the rectification within the prescribed time limit. There is no rectification of 20 to 30 yuan/item according to the requirements within the prescribed time limit.

The section will organize a full-scale equipment inspection once a week, and find out the problems in a timely manner, and do a good job in equipment inspection records and rectification records. The lack of inspection deductions of 20 yuan, no inspection records, low inspection quality, according to the lack of inspection The problems found were not rectified in time, and the deductions were 10-20 yuan/item, and the records without rectification were not rectified.

The section should supervise the maintenance workers to implement the regional division responsibility system. The equipment inspections in the area should be carried out no less than three times a week, and the inspection records should be made. For the problems checked by the maintenance workers, the sections should be arranged in time. For the maintenance workers missing a check, deducting 30 yuan, no inspection quality is low, according to the lack of inspection.

For the problems identified by the maintenance workers, the work section was not arranged in time, and the deduction was 30 yuan/time.

The equipment group shall conduct inspections of the main equipment of the whole plant not less than twice a week, and make inspection records. The problems identified shall be promptly notified in writing to the deadline.

The equipment department lacked a check for 30 yuan, and there was no inspection record.

The section did not process the deduction of RMB 20/item according to the requirements of the equipment department within the specified time.

Equipment should be inspected frequently during equipment operation, including sound, vibration, temperature, odor, pressure, current, voltage, fuel consumption, etc. In case of abnormal situation, you should find the cause and handle it immediately.

Equipment lubricant management system and assessment methods

Management System

The lubrication of each equipment is the responsibility of the operator of the machine (except electrical equipment).

The operator must lubricate the equipment for a specified period of time.

All equipments that are lubricated with oil cups and butter according to the design, oil cups and tubing should be complete and intact, and oil-lubricated equipment should be completed.

Cover with a clean oil drum, lubricate it, and place it in a clean place.

The lubrication parts of the equipment must be filled with the specified amount of oil.

Assessment method

There is a device that is poorly lubricated (including lack of oil in the oil cup, dry parts of the lubrication, oily roads, fuel pipe rupture, insufficient gearbox oil, oil quality does not match), deduction of 20 yuan / time

Lubricating equipment with oil cup and butter, oil cup and tubing are not complete, not intact, the deduction section is 20 yuan / place, the oil cover of the oil with engine oil (including MOS2) is not complete, not intact, deducting 20 yuan.

The oil drum filled with oil is not clean, there is no cover, the oil drum is placed in an unclean place, and the deduction is 20 yuan/way.

Too much oil will cause the equipment to leak oil, and there will be a grease deduction of 10 yuan per unit outside the oil cup.

Deutz 1015 Engine

Manufacture with imported Germany Deutz company production certificate with the power range of 195 to 560kw . The product is of high speed four-storke water cooling Diesel Engine with V-90°. The one-cylinder-one-head structure ensures generality of parts , inner oil pope,inner water chnnel,four-valve, center top-mounted 8 hole fuel injector,turbo-inter-cooled. It features high power, low fuel consumption, large torque,perfect plateua adaptability,low noise and simple maintenance. BFM1015 series diesel engine has an excellent cold starting performance . Without the starting assistant, 6-cylinder engine can start at -19℃,and 8-cylinder could be -17℃.If starting assistant equipped , the 6-cylinder engine can start at -35℃ and -32℃ on V8 engine

Deutz 1015 Engine

BFM1015&TCD2015 diesel engine

Deutz Diesel Engine,6 Cylinder Diesel Engine,Deutz Industrial Engines,Water Cooled Engines,Deutz 1015 Engine

Shijiazhuang Houfeng Trading Co.,Ltd , https://www.hfdieselengine.com