Research on optical laser fast scanning visual measurement technology

The development of optical laser fast scanning visual measurement technology and instrument optical/laser fast scanning visual measurement technology and instrument has adapted to the requirements of high-speed inspection in manufacturing. The visual measurement technology is mainly applied to the rapid measurement of geometrical dimensions and positional errors of complex curved surfaces (such as car body, mold and other three-dimensional shapes), and is widely used in online measurement and reverse engineering.

Laser scanning measuring instrument for reverse engineering The LACUS series laser line scanning measuring instrument developed by Hisense Reverse Engineering Co., Ltd. uses optical triangulation method to stratify or track the surface of the object with a laser knife, and then collects the surface to be measured by CCD. After the light knife curve, through the computer software for data processing, you can get the surface 3D data of any complex surface, the measurement accuracy can reach 0 05mm. The 3D laser scanner exhibited by Beijing Machine Tool Research Institute can realize plane scanning, rotating scanning, Two-phase scanning, hybrid scanning and other scanning methods, the line laser scanning speed can reach 1000 points / s.

Nextec's Hawk series of 3D scanning and digitizing systems use WIZ probes, with excellent optical systems, unique Beijing Machine Tool Research Institute 3D laser scanner control and image processing software, for almost all materials and finishes (including The surface of the block gauge is scanned and automatically self-calibrated, and the surface contour of the workpiece can be automatically tracked; the accuracy of the instrument can reach 10m, the accuracy of the fitting curve is 2m/100 points, the repeatability is 2m, the resolution is 1 m, and the maximum The scanning speed is 100mm/s and the data acquisition speed is 40 points/s, which can meet the requirements of high-precision fast scanning measurement.

(Finish)

Service Scope: Steam Turbine spare parts supply; steam turbine installation, inspection & overhaul, technological upgrading, turbine technology training, turbine low oil pressure renovation, turbine rotor shaft bend restoration, lower turbine`s vibration and noise, remove speed governing system abnormal volatility or load swing, solve turbine insufficient output, discontent load or other common/exceptional faults.


  Contract to overhaul and all kinds of turbine`s remould, turbine dynamic balance and so on, for satisfying practical operation requirements.


   Provide technical support and service for operation, inspection, maintenance, accident treatment and so on.


1. Steam Turbine Maintenance/Overhaul Service

 

   Steam turbine normal overhaul, failure treatment; main body components repair, heat exchange tubes of cooler replacement and so on.


2. Technical guidance


   Generating or Industrial driving turbine inspection, overhaul, upgrading and other items technical guidance.


3. Thermodynamic System Optimizing Services


   For operating or planning projects or equipment, according to end users` actual CHP(or heat-work cooling) requirements, make cycle efficiency analysis, provide system optimizing service.


4. Speed Governing System Remould

 

   Upgrade old hydraulic governing system to digital electro-hydraulic governing system, satisfy flexi-ble configuration all kinds of control strategy requirement.

5. Flow Passage Optimization and Modification


Total modification for steam turbine shall increase old turbine`s economic efficiency with advanced technology, service life also shall be extension.


6. Turbine Parameters Remold and Modification


Apply to processing or procedure transformation (or project site change) cause turbine operation parameters` change.


7. Uncontrolled extraction steam reconstruction


Consideration of turbine security and economic, open a hole for extraction steam normally in order to heat supply reformation.


8. Steam Turbine Engineering Service


Provide small & middle size Steam Turbine Generator or industrial steam turbine complete set engineering, project design and project installation service.


9. Vibration Analysis and Rotor Dynamic Balance

24Hours Service for emergency vibration analysis and wide range rotor dynamic balance service at project site or back to factory.


10. Condensing (extraction condensing) type remodel to back pressure type


Condensing (extraction condensing) steam turbine remodel to Back Pressure Steam Turbine


11. Steam Turbine Vacuum System Upgrade


Condenser three-dimension design and upgrade, reduce heat-transfer temperature difference, increase steam exhaust vacuum degree, improve turbine economic efficiency. Water cooling remodel to air cooling.


12. Steam Turbine Enlargement Capacity Reconstruction


Reconstruct the turbine`s capacity which are caused by system or equipment changing.


13. Motor Speed Governing Variable-frequency Remould

 

 Variable-frequency drive remould for pump systems of all kinds of industrial and mining enterprises.


14. Domestic Equipment Reconstruction


Domestic equipment reconstruction for imported turbine


15. Circulating Cooling Water System Optimization and Modification


Optimization and modification of operating circulating cooling water system, reduce operation energy consumption rate.


16. Waste Heat Steam Turbine Gland Seal System Upgrade


After upgrade, steam leakage ( effect gear box oil quality) shall be improved by the reason of waste heat parameters are not stable.


17. Spare Parts Marketing


Normal easily damaged parts warehouse, shorten delivery time.

Case 1


   A fertilizer company has 2 sets of steam turbine, model are: CB6-3.43/1.27/0.294 and CB6-3.43/1.17/0.294. Because end user`s power load and steam consumption are changed, the turbines must be reconstructed according to steam parameters, flow change and guarantee high efficiency.


   Remould Parameters: turbine max. inlet steam is 100t/h, when inlet steam is 97t/h and inlet pressure is 3.15MPa(g), its extraction steam is 62t/h extraction pressure is 1.51MPa(g), exhaust pressure is 0.21MPa(g), guarantee output is 5800KW (deviation±5% ).


   Main job of remould and overhaul:


   1. Casing was sent back to manufacture`s factory for rebuilding 2 valve seat hole, expand nozzle block steam passage.


   2. Change nozzle block, take out guide blade carrier.


   3. The original double row governing stage impeller and blade was changed to single row governing stage impeller and blade, add governing stage sheath, parts of rotor sleeve need to be changed and adjusted.


   4. LP stage 3rd diaphragm steam passage inspection optimization.


   5. Casing and rotor dismounting and assembling in factory with comprehensive inspection.


   6. Rotor low speed dynamic balance test.


   7. Governor static test in factory, overspeed test.


   8. Dismount & assembly, overhaul at project site.


   9. Clear incrustation for steam governing valve, nozzle and blade.


   10. Gland seal inspection and replacement, gland sealing clearance adjustment, change the seal block which was severe wear, spring leaf which are damaged should be changed.


   11. Every bearing repair and adjust.


   12. HP & LP governing steam valve grinding, stroke adjustment.


   13. Front bearing pedestal dismounting and inspection, patch oil leaking points.


   14. Inspection and patching steam leaking of HP steam governing valve link rod.


   15. Turbine mainbody troubleshooting.

   After remolding is complete, the 2 turbine sets are running very well.

Case 2

There is a paper mill which has a set of steam turbine: B6-3.43/0.981. Due to processing consumption in workshop and load were changed, the end user request reset new back pressure and achieve the best efficiency within the shortest time.


   Parameters reform to: when rated inlet flow: 55t/h, inlet pressure: 3.43±0.2MPa(a), exhaust pressure: 0.59MPa(a), steam rate guarantee value must be 11.65kg/(kw·h), output power must be 4700KW under rated working condition. The reconstruction project is a turnkey project, from preparing components to dismount heat material, equipment dismounting and installation, till to equipment commissioning successfully.


   For reducing the work amount, keep casing and pipelines still, main jobs are following:


   1. Change front & rear gland seal and diaphragm seal.


   2. Change main shaft assembling (keep mail oil pump and coupling still).


   3. Change HP nozzle block, HP guide blade carrier and original 2 stage diaphragm, add 3 stage diaphragm, 5 stage diaphragm adopts special design for satisfy the requirement.


   4. Change the original 3 stage impeller and add another 3 stage impeller.


   5. Steam governing valve link rod adjust inlet steam, check all butterfly valves matching conditions, improper ones should be changed.


   6. Original rotor`s coupling, MOP shall be mounted in new rotor.


   7. Rotor balance.


   8. Change sylphon of governing system.


   9. Change pressure transducer sleeve, adjust hydraulic servo-motor stroke.


   10. Governor static test in factory.


   11. Clear oil system.


  The reconstructed steam turbine is B4.7-3.43/0.59, end user evaluates steam rate, vibration, exhaust temperature very strictly, but the reconstructed steam turbine is running very well and fully meet the design performance.